Skip to content
· Newport Beach Kitchen Co

The 1970s Kitchen Is Newport Beach's Most Common Renovation

The 1970s produced more Newport Beach housing than any other decade, and the kitchens from it all share the same three problems. What they are and what fixing them costs.


Look at the building era data for Newport Beach and one decade stands out. US Census American Community Survey estimates put the city at roughly 44,042 housing units, of which about 9,795 were built between 1970 and 1979. That is around 22 percent of the entire housing stock, more than any other decade, and it is why so many kitchen conversations in this city start the same way.

Add the 1960s at about 5,865 units and the 1950s at about 4,212, and more than 45 percent of Newport Beach housing was built between 1950 and 1979. Those thirty years produced a specific kind of kitchen.

What a 1970s kitchen looks like

The plan is consistent enough that a contractor who has done one can usually predict the rest.

A separate room, generally at the back of the house near the garage. A doorway rather than an opening to the dining or family room. Wall cabinets to about 84 inches with a boxed soffit above them running to the ceiling. A window over the sink. Eight or nine feet of usable counter, most of it broken by the sink and the cooktop. A pantry cupboard if you were lucky. And a service door out to the garage.

It was a good plan for a household where one person cooked and everyone else waited in another room. It is a bad plan for a household where the kitchen is where people are.

The three problems, in order of cost

The wall. On mid-century tract framing in Newport Heights, Eastbluff and the neighbouring parts of Costa Mesa, the wall between kitchen and family room is load-bearing more often than not. Removing it turns into structure: an engineered beam, posts to a bearing point, sometimes a new pad footing under a slab, and a permit revision. Budget $8,000 to $25,000, plus $1,500 to $4,000 for the engineering. It is also the change that transforms the house, which is why people do it anyway.

The soffit. The boxed section above the wall cabinets does two things: it lowers the apparent ceiling and it wastes 16 inches of vertical storage. Removing it and running the cabinetry higher is one of the cheapest changes available on this stock, and it is dramatically cheaper while the ceiling is already open for the beam. Doing it later as its own job means opening the ceiling again.

The services. A 1972 kitchen was wired for a refrigerator, a range and a couple of counter outlets. A 2026 kitchen assumes two small-appliance circuits, dedicated circuits for the dishwasher and disposal, GFCI protection on the counter receptacles, arc-fault protection on the branch circuits, and receptacle provision at the island. On top of that, an induction range and an EV charger on the same 100 amp service usually means a panel upgrade at $3,000 to $6,500.

What it does not usually need

Worth saying, because it saves money. The cabinetry boxes in a 1970s kitchen are often particleboard and rarely worth keeping, but the framing, the subfloor and the drainage are generally sound. Houses of this era were built quickly and repetitively, and repetitive building is predictable building. The nasty surprises on this stock come from what previous owners did to it rather than from what the original builder did.

Asbestos in flooring adhesive and sheet vinyl backing is the exception, and it is common enough on pre-1980 housing that it belongs on the exclusions list of any honest quote rather than as a surprise in week two.

The order that saves money

  1. Establish whether the wall is bearing, before anything is designed. That single answer sets the budget band.
  2. If a beam is involved, engage the engineer and submit for plan check before demolition, so plan check runs alongside cabinet lead time rather than after it.
  3. Take the soffit out while the ceiling is open.
  4. Deal with the panel and the wiring while the walls are open, because that is the cheapest they will ever be to reach.
  5. Choose appliances before the cabinet drawings are signed off, because their dimensions drive the layout.

What it comes to

A full remodel on a 190 square foot 1970s Newport Beach kitchen with the wall out, semi-custom cabinetry, quartz counters and a modest island lands around $92,000 before appliances. Without the structural work it is closer to $72,000. With full custom cabinetry it passes $115,000.

The cost guide breaks that down line by line, and the layout changes page covers what taking the wall out actually involves.

Find out what your kitchen costs

Call (949) 791-4160 or use the quote form, and a Newport Beach kitchen company prices the work at no charge.